WORKSHOPS
CATEGORY
WISE FACILITY IN WORKSHOPS
Page
. 1
2
CATEGORY |
DESCRIPTION
OF FACILITIES / SHOPS
|
A |
MACHINE
SHOP, WELDING SHOP, ELECTRICAL SHOP, F.I. PUMP SHOP, VEHICLE
SHOP, BULLDOZER ENGINE SHOP, UNDER CARRIAGE SHOP, CARPENTRY
SHOP, FOUNDRY SHOP, BLACK SMITH / FORGING SHOP AND FITTING
SHOP |
B |
MACHINE
SHOP, WELDING SHOP, ELECTRICAL SHOP, VEHICLE SHOP, BULLDOZER
ENGINE SHOP, FOUNDRY SHOP, BLACK SMITH / FORGING SHOP AND
FITTING SHOP |
C |
MACHINE
SHOP, WELDING SHOP, BLACK SMITH SHOP AND FITTING SHOP |
CATEGORY
WISE LOCATION
CATEGORY |
NO.
OF W/SHOPS |
LOCATION |
A |
8 |
BAHAWALPUR,
MULTAN, FAISALABAD, LAHORE QUAIDABAD, LAYYAH, RAWALPINDI AND
TALAGANG |
B |
7 |
D.
G. KHAN SAHIWAL, GUJRANWALA, MIANWALI, ATTOCK KHANPUR AND RAWALPINDI
(SOIL CONSERVATION) |
C |
9 |
BAHAWALNAGAR,
VEHARI, KASUR, SHEIKHUPURA, SAILKOT, GUJRAT, SARGODHA, JHELUM
AND JHANG |
TOTAL |
24 |
|
WELL
DRILLING
PROCUREMENT
STATUS OF WELL DRILLING MACHINERY
Year
of Procurement |
Hand
Boring Plants |
Power
Drilling Rig |
Electrical
Resistively Meter |
Power
Winches |
Air
Compressor |
1964 |
214 |
- |
- |
- |
- |
1988-89 |
- |
10 |
2 |
- |
10 |
1995-98 |
- |
- |
- |
21 |
- |
1997-98 |
- |
9 |
- |
- |
- |
Total |
214 |
19 |
2 |
21 |
10 |
LIFE
COVERED OF WELL DRILLING MACHINERY
DESCRIPTION |
No.
of Bulldozers |
| HAND
BORING PLANTS (MILLION FT.) |
12.850 |
| POWER
DRILLING RIGS (MILLION FT.) |
0.449 |
| ELECTRICAL
RECEPTIVITY METER (SURVEYS) |
380 |
| WELL
DEVELOPMENT (NOS) |
1652 |
HIRING RATES OF POWER DRILLING RIG (RS.)
Bore
Size (Inches) |
Hiring Rate (Rs. per ft.) |
8-10 |
149 |
12-15 |
217 |
16-18 |
257 |
19-20 |
424 |
21-24 |
496 |
HIRING
RATES OF HAND BORING PLANTS (RS.)
Bore
Size
(Inches)
|
Full
Rate
(Rs. per ft.)
|
Subsidized
Rate (Rs per ft.) |
7 |
17 |
5 |
8 |
18 |
8 |
10 |
22 |
11 |
12 |
39 |
21 |
14 |
46 |
24 |
16 |
53 |
27 |
18 |
56 |
30 |
HIRING
RATES OF POWER WINCHE, ERM, AIR COMPRESSOR AND GEO-LOGGER
WELL
DRILLING MACHINERY AND EQUIPMENT |
HIRE
RATE |
| Power
Winches |
RS.
13 per foot |
| Electrical
Resistivity Meter |
RS.
2500 per survey |
| Air
Compressor |
|
|
Agriculture |
RS.
222 per hour |
| Full |
RS.
500 per hour |
| Commercial |
RS.
1000 per hour |
| Geo
logger |
RS.
5000 per survey |
DIRECTORATE
WISE DEPLOYMENT OF WELL DRILLING MACHINERY
DIRECTORATE |
HAND
BORING PLANTS |
POWER
DRILLING RIGS |
RESISTIVITY
METER |
POWER
WINCHES |
| Multan |
74 |
4 |
1 |
12 |
| Faisalabad |
49 |
5 |
0 |
5 |
| Lahore |
91 |
20 |
1 |
4 |
|
Total: |
214 |
29 |
2 |
21 |
ACTION
PLAN OF WELL DRILLING MACHINERY (2002-03)
Machinery
and Equipment |
Functional
Units |
Annual
Target |
Income
Target
(M. RS) |
| Hand
boring plant |
181 |
354000
FT. |
2.915 |
| Power
drilling rig |
20 |
625000
FT. |
10.481 |
| Resistivity
meter |
2 |
48
NOS |
0.120 |
| Power
winch |
17 |
40800
FT. |
0.530 |
| Air
compressor |
13 |
156
NOS |
0.034 |
| Total |
. |
. |
14.080 |
Page
. 1
2
|