|
Sr. #
|
Project Name
|
Cost
(Rs. Million)
|
|
1
|
Fruit & Vegetable Development Project Punjab.
(2005-06 to 2009-10)
|
648.595
|
|
2
|
Promotion of Tunnel Technology for Vegetable Production
(2008-09 to 2009-10)
|
526.120
|
|
3
|
Targeting Food Security through Productivity Enhancement of Wheat.
(2008-09 to 2010-11)
|
866.506
|
|
4
|
Promotion of Lentil in Phothor.
(2008-09 to 2010-11)
|
5.000
|
|
5
|
Up-scaling of Biotechnology Research Institute, AARI Faisalabad.
(2005-06 to 2009-10)
|
136.580
|
|
6
|
Development of Better Oilseed Varieties/Hybrids to Enhance the Oilseed Production.
(2006-07 to 2010-11)
|
30.265
|
|
7
|
Acceleration of Pulses Research and Production in Punjab for its Import Substitution.
(2006-07 to 2009-10)
|
8.293
|
|
8
|
Development of Wheat Analytical Facilities.
(2007-08 to 2009-10)
|
146.686
|
|
9
|
Up-Gradation of physical infra-structure AARI, campus.
(2008-09 to 2009-10)
|
88.132
|
|
10
|
Research On Insecticide Resistance.
(2008-09 to 2010-11)
|
19.462
|
|
11
|
Creation of Physical Infrastructure for Research on Mango under Corporate Mode at Multan.
(2007-08 to 2009-10)
|
71.997
|
|
12
|
Strengthening of research facilities at MMRI, Sahiwal.
(2008-09 to 2010-11)
|
54.833
|
|
13
|
Production of Jojoba through Research and Extension
(2006-07 to 2009-10)
|
17.208
|
|
14
|
Ground Water Quality Assessment in Punjab.
(2004-05 to 2009-10)
|
36.836
|
|
15
|
National program for improvement of watercourses (Supervisory consultancy- Punjab component).
(2003-04 to 2009-10)
|
497.500
|
|
16
|
Water conservation and productivity enhancement through high efficiency irrigation systems(The Punjab component)
(2008-09 to 2011-12)
|
1199.500
|
|
17
|
Greater Thal Canal (GTC) command area development project phase-1.
(2008-09 to 2012-13)
|
1994.712
|
|
18
|
Enhancing Productivity of Flowering Crops in peri-urban areas of Lahore.
(2008-09 to 2010-11)
|
28.794
|
|
19
|
Cotton Sticks Management.
(2007-08 to 2009-10)
|
12.517
|
|
20
|
Farm Mechanization for Food Security.
(2008-09 to 2010-11)
|
690.000
|
|
21
|
Strengthening of Punjab Agriculture Research Board.
(2007-08 to 2010-11)
|
195.200
|
|
22
|
Funding of High Priority Research through Competitive Grant System.
(2007-08 to 2010-11)
|
3126.304
|
|
23
|
Management of Fruit Fly through IPM Techniques
(2008-09 to 2010-11)
|
84.889
|
|
24
|
Enhancing Utility of Website of Agriculture Department.
(2008-09 to 2009-10)
|
7.000
|
|
25
|
Human Resource development for improvement of Extension services.
(2009-10 to 2010-11)
|
204.932
|
|
26
|
Establishment of Biotech Testing Crops at AARI, Faisalabad
(2009-10 to 2011-12)
|
35.000
|
|
27
|
Establishment of Provincial Reference Fertilizer and Pesticide Testing Laboratory at Lahore.
|
115.919
|
|
28
|
Introduction of Mechanized Transplanting of Rice through Service Providers
(2009-10 to 2011-12)
|
17.000
|
|
29
|
Development of Digitized Profile of Land for Agriculture in the Province.
|
25.000
|
|
30
|
Strengthening of SSRI for Research on Salt Affected Soils and Brackish Water in Southern Punjab
|
47.298
|
|
31
|
Provision of Additional Facilities for Pesticide Labs
(2009-10 to 2011-12)
|
51.054
|
|
32
|
Establishment of Rice Research Station At Bahawalnagar.
|
141.498
|
|
33
|
Up-Gradation of Water Management Training Institute
(2009-10 to 2011-12)
|
109.214
|
|
34
|
Pilot Testing of Solar Irrigation Pumps
(2009-10 to 2010-11)
|
19.230
|
|
35
|
Pilot Project for Cotton Cultivation on Drip Irrigation in Thal Region
(Jan 2010 to Dec 2011)
|
267.000
|
|
36
|
Preparation of Master plan for Development/Beautification of Bagh-e-Jinnah Lahore.
|
2.000
|
|
37
|
Procurement of New Bulldozers (120 hp) through Local Resources.
|
10.000
|
|
38
|
Pilot Project Adaptation of Boi-Gas Technology to Mitigate Energy Crisis
(2009-10 to 2010-11)
|
66.775
|
|
39
|
Disposal of Expired and Spurious Pesticides
(2009-10 to 2010-11)
|
60.000
|
|
40
|
Improvement Quality and Enhancing Frequency of Audio/ Video Productions on Agriculture
(2009-10 to 2010-11)
|
1.859
|