Home  >  Agricultural Field  >  Projects  >  Completed
Completed Projects
 

Sr. No.

Name of Project

Cost

( Rs. M)

Period

Target

Achievement

  1.  

Replacement of Existing Fleet of Crawler Tractors

204.600

1973-77

to

1977-80

600 Dozers

600 Dozers

  1.  

Procurement of Crawler Tractors

235.800

1982-86

300 Dozers

300 Dozers

  1.  

Procurement / Replacement of Crawler Tractor

239.200

1986-88

(18 months)

150 Dozers

140 dozers

  1.  

Land Resource Development for the Uplift of Farming Community

594.400

1991-95

300 Dozers

113 Dozers

  1.  

Bulk provision of spare parts for repair of Crawler tractors to improve efficiency of land development operations

58.000

1991-94

Procurement of  Spare Parts

100 % Spare Parts Procured

  1.  

Subsidy of sinking of private diesel tubewells in Punjab

Phased programmed (Scheme drawn on yearly basis)

1973-74 to

1995-96

Installation of Tubewell

27492 tubewell installed under whole programme

  1.  

Lift irrigation scheme in the Punjab

Phased programmed (Scheme drawn on yearly basis)

1974-75 to

1992-93

Distribution of Mobile Diesel Pumps

4467 mobile diesel pumping sets distrusted

  1.  

Installation of turbine tubewells in Barani areas of district Sialkot

Rs. 4.750

1987-90

Installation of 50 turbine tubewell

48 turbine tubewells installed

  1.  

Installation of tubewell in Mohar and Soan Valley areas of District Khushab

Rs. 2.850

1990-94

Installation of 30 turbine tubewells

30 turbine tubewell installed

  1.  

Provision of assured water supply for increased agriculture production through installation of turbine tubewells in Barani areas of Rajanpur District

Rs. 4.750

1994-95

Installation of 50 turbine tubewells

40 turbine tubewell installed

  1.  

Provision of subsidy on installation of tubewell in D.G.Khan district

Rs. 4.750

1996-98

Installation of 50 turbine tubewells

48 turbine tubewell installed

  1.  

Procurement of power drilling rigs

Rs. 46.600

1987-89

Procurement of 10 power drilling rigs

10 power drilling  rigs procured

  1.  

Exploration of groundwater in the Punjab

Rs. 458.167

1997-99

Procurement of 10 power drilling rigs

10 power drilling  rigs procured

  1.  

Strengthening of AMIR, Multan

Rs. 2.550

1984-88

Research capabilities strengthened

-

  1.  

Hydri-Drill Research Sargodha

Rs. 3.996

1984-88

1. Test bores drilled (200 Nos.)

2.  Water lifting devices tested (6 Nos.)

-

  1.  

Establishment of Industrial Research & Extension Division in AMRI, Multna

Rs. 30.400

1987-90

1.  Technical handouts prepared (4 Nos.)

2.  Trainings to manufactures (20 Nos.)

-

  1.  

Research and Introduction of mechanized cotton picking in Punjab

Rs. 6.608

1995-98

Single row low cost cotton picking machine developed

-

  1.  

Provision of stipend to the trainees of agricultural machinery training schools

Rs. 0.250

1982-2000

1.  Tractor operations trained (12005)

2.  Tractor mechanics trained  (587)

-

  1.  

Water resource development through installation of diesel tubewells in canal commanded and saliaba areas of Punjab at subsidy cost

Rs. 39.492

1991-92

To

1992-93

Installation of 2312 tubewells

2131 tubewells installed

  1.  

Water resource development through installation of diesel tubewells in canal commanded and saliaba areas of Punjab

Rs. 35.340

1991-93

Installation of 1353 tubewells

1216 tubewells installed

  1.  

1st Barani area development project (Soil and water Conservation component)

Rs. 120.000

1981-90

--

Soil & water conservation measures in Shakargarh and Sohawa Teshils

  1.  

2nd Barani area development project (Soil and water Conservation component)

Rs. 301.351

1990-98

--

Soil & water conservation measures in Shakargarh and Sohawa Fethjang &  Chakwal Tehsils

23.

Establishment of water recharge system through construction of mini dams in valley Soan Skasar and Mohar area of District Khushab.

18.212

Two years (2005-07)

Construction of 16 Nos. delay action mini dams

15 Mini Dams were constructed and are successfully being used for water recharge in the area

24.

Strengthening of well drilling services through procurement of machinery and equipment

11.1184

Two Years (2005-07)

Procurement of power winches and welding generators

Use of power winches and welding generators has helped strengthening of well drilling services of the department.

Procurement of tubewell endoscopy and rehabilitation equipment including bore hole video system, well servicing equipment, pipe and filter repair kit, jetting system, jetting heads and well cleaning chemicals etc.

Through this project department is able to provide tubewells rehabilitation services to the farmers.

Procurement of 2 Nos. vehicles and their customization

The vehicles were used to mount the t/well rehabilitation equipment.

Training of staff

The capacity of departmental engineers was enhanced to provide efficient services.

25.

Procurement of bulldozers transporters to strengthen transportation facilities

37.500

One Year

(2006-07)

Procurement of 10 truck chassis and fabrication of their bodies to make transporters for bulldozer operation.

Fabrication of transporters bodies is being done at KAZ. 10 bodies have been completed.

26.

Construction of Residences for Agricultural Engineering staff at Talagang District Chakwal

6.292

3 Years

(2004-07)

Construction of 1 Residence of    officer (BS-18) and 2 residences of  (BS-17)

Residence constructed and staff shifted.

27.

Rehabilitation / Rebuilding of Komatsu bulldozers

197.439

Two Year

 (2007-2009)

Procurement of essential spare parts for rehabilitation of 60 bulldozers and strengthening of 3 workshops by providing tools & equipments and service vehicles.

60 Komatsu bulldozers rehabilitated and 3 workshops strengthened.

29.

Promotion of Mechanized Multi-crop Farming in Mixed Cropping Zone of the Punjab”

(50% Subsidy)

 419.000

2008-09

To

2009-10

5,806 Farm Implements

3,982

30.

Cotton sticks management in cotton areas of Punjab

12.517

3 Years

(2007-10)

Procurement of Cotton sticks puller shredders, compost shredders and cotton root diggers.

100 % Machinery related with cotton crop, cotton stick management procured & introduced in cotton area with an overall objective to control Pink Boll Worm and enhance organic matter through cotton sticks incorporation into the soil. 

31.

Farm Mechanization for Food Security             (50 % subsidy)

690.000

(Rs. 347.575 million Govt. Share)

3 Years

(2008-10)

Provision of 10521 different machines and implements to the

9542 Nos. of Implements delivered

 