Sr. No.
|
Name of Project
|
Cost
( Rs. M)
|
Period
|
Target
|
Achievement
|
-
|
Replacement of Existing Fleet of Crawler Tractors
|
204.600
|
1973-77
to
1977-80
|
600 Dozers
|
600 Dozers
|
-
|
Procurement of Crawler Tractors
|
235.800
|
1982-86
|
300 Dozers
|
300 Dozers
|
-
|
Procurement / Replacement of Crawler Tractor
|
239.200
|
1986-88
(18 months)
|
150 Dozers
|
140 dozers
|
-
|
Land Resource Development for the Uplift of Farming Community
|
594.400
|
1991-95
|
300 Dozers
|
113 Dozers
|
-
|
Bulk provision of spare parts for repair of Crawler tractors to improve efficiency of land development operations
|
58.000
|
1991-94
|
Procurement of Spare Parts
|
100 % Spare Parts Procured
|
-
|
Subsidy of sinking of private diesel tubewells in Punjab
|
Phased programmed (Scheme drawn on yearly basis)
|
1973-74 to
1995-96
|
Installation of Tubewell
|
27492 tubewell installed under whole programme
|
-
|
Lift irrigation scheme in the Punjab
|
Phased programmed (Scheme drawn on yearly basis)
|
1974-75 to
1992-93
|
Distribution of Mobile Diesel Pumps
|
4467 mobile diesel pumping sets distrusted
|
-
|
Installation of turbine tubewells in Barani areas of district Sialkot
|
Rs. 4.750
|
1987-90
|
Installation of 50 turbine tubewell
|
48 turbine tubewells installed
|
-
|
Installation of tubewell in Mohar and Soan Valley areas of District Khushab
|
Rs. 2.850
|
1990-94
|
Installation of 30 turbine tubewells
|
30 turbine tubewell installed
|
-
|
Provision of assured water supply for increased agriculture production through installation of turbine tubewells in Barani areas of Rajanpur District
|
Rs. 4.750
|
1994-95
|
Installation of 50 turbine tubewells
|
40 turbine tubewell installed
|
-
|
Provision of subsidy on installation of tubewell in D.G.Khan district
|
Rs. 4.750
|
1996-98
|
Installation of 50 turbine tubewells
|
48 turbine tubewell installed
|
-
|
Procurement of power drilling rigs
|
Rs. 46.600
|
1987-89
|
Procurement of 10 power drilling rigs
|
10 power drilling rigs procured
|
-
|
Exploration of groundwater in the Punjab
|
Rs. 458.167
|
1997-99
|
Procurement of 10 power drilling rigs
|
10 power drilling rigs procured
|
-
|
Strengthening of AMIR, Multan
|
Rs. 2.550
|
1984-88
|
Research capabilities strengthened
|
-
|
-
|
Hydri-Drill Research Sargodha
|
Rs. 3.996
|
1984-88
|
1. Test bores drilled (200 Nos.)
2. Water lifting devices tested (6 Nos.)
|
-
|
-
|
Establishment of Industrial Research & Extension Division in AMRI, Multna
|
Rs. 30.400
|
1987-90
|
1. Technical handouts prepared (4 Nos.)
2. Trainings to manufactures (20 Nos.)
|
-
|
-
|
Research and Introduction of mechanized cotton picking in Punjab
|
Rs. 6.608
|
1995-98
|
Single row low cost cotton picking machine developed
|
-
|
-
|
Provision of stipend to the trainees of agricultural machinery training schools
|
Rs. 0.250
|
1982-2000
|
1. Tractor operations trained (12005)
2. Tractor mechanics trained (587)
|
-
|
-
|
Water resource development through installation of diesel tubewells in canal commanded and saliaba areas of Punjab at subsidy cost
|
Rs. 39.492
|
1991-92
To
1992-93
|
Installation of 2312 tubewells
|
2131 tubewells installed
|
-
|
Water resource development through installation of diesel tubewells in canal commanded and saliaba areas of Punjab
|
Rs. 35.340
|
1991-93
|
Installation of 1353 tubewells
|
1216 tubewells installed
|
-
|
1st Barani area development project (Soil and water Conservation component)
|
Rs. 120.000
|
1981-90
|
--
|
Soil & water conservation measures in Shakargarh and Sohawa Teshils
|
-
|
2nd Barani area development project (Soil and water Conservation component)
|
Rs. 301.351
|
1990-98
|
--
|
Soil & water conservation measures in Shakargarh and Sohawa Fethjang & Chakwal Tehsils
|
|
23.
|
Establishment of water recharge system through construction of mini dams in valley Soan Skasar and Mohar area of District Khushab.
|
18.212
|
Two years (2005-07)
|
Construction of 16 Nos. delay action mini dams
|
15 Mini Dams were constructed and are successfully being used for water recharge in the area
|
|
24.
|
Strengthening of well drilling services through procurement of machinery and equipment
|
11.1184
|
Two Years (2005-07)
|
Procurement of power winches and welding generators
|
Use of power winches and welding generators has helped strengthening of well drilling services of the department.
|
|
Procurement of tubewell endoscopy and rehabilitation equipment including bore hole video system, well servicing equipment, pipe and filter repair kit, jetting system, jetting heads and well cleaning chemicals etc.
|
Through this project department is able to provide tubewells rehabilitation services to the farmers.
|
|
Procurement of 2 Nos. vehicles and their customization
|
The vehicles were used to mount the t/well rehabilitation equipment.
|
|
Training of staff
|
The capacity of departmental engineers was enhanced to provide efficient services.
|
|
25.
|
Procurement of bulldozers transporters to strengthen transportation facilities
|
37.500
|
One Year
(2006-07)
|
Procurement of 10 truck chassis and fabrication of their bodies to make transporters for bulldozer operation.
|
Fabrication of transporters bodies is being done at KAZ. 10 bodies have been completed.
|
|
26.
|
Construction of Residences for Agricultural Engineering staff at Talagang District Chakwal
|
6.292
|
3 Years
(2004-07)
|
Construction of 1 Residence of officer (BS-18) and 2 residences of (BS-17)
|
Residence constructed and staff shifted.
|
|
27.
|
Rehabilitation / Rebuilding of Komatsu bulldozers
|
197.439
|
Two Year
(2007-2009)
|
Procurement of essential spare parts for rehabilitation of 60 bulldozers and strengthening of 3 workshops by providing tools & equipments and service vehicles.
|
60 Komatsu bulldozers rehabilitated and 3 workshops strengthened.
|
|
29.
|
Promotion of Mechanized Multi-crop Farming in Mixed Cropping Zone of the Punjab”
(50% Subsidy)
|
419.000
|
2008-09
To
2009-10
|
5,806 Farm Implements
|
3,982
|
|
30.
|
Cotton sticks management in cotton areas of Punjab
|
12.517
|
3 Years
(2007-10)
|
Procurement of Cotton sticks puller shredders, compost shredders and cotton root diggers.
|
100 % Machinery related with cotton crop, cotton stick management procured & introduced in cotton area with an overall objective to control Pink Boll Worm and enhance organic matter through cotton sticks incorporation into the soil.
|
|
31.
|
Farm Mechanization for Food Security (50 % subsidy)
|
690.000
(Rs. 347.575 million Govt. Share)
|
3 Years
(2008-10)
|
Provision of 10521 different machines and implements to the
|
9542 Nos. of Implements delivered
|