|
Sr. #
|
Project Name
|
Project Period
|
Cost (Million Rs.)
|
Target
|
|
1
|
National Program for improvement of Watercourses in Pakistan-the Punjab Component (Supervisory Consultancy)
|
2004-05 to 2007-08 (extended from 2008-09 to 2009-10)
|
28223.50
|
|
|
2
|
Water Conservation and Productivity Enhancement through High Efficiency (Pressurized) Irrigation System (Punjab Component)
|
2008-09 to 2011-12
|
6,917.17
|
|
|
3
|
Greater Thal Canal (GTC) Command Area Development Project (Phase-I)
|
2008-09 to 2012-13
|
1,994.71
|
-
Earthen construction and lining of 725 Watercourses
-
Provision of 36 LASER units
-
Technical assistance for LASER Land Leveling of 36,000 acres.
|
|
4
|
Up-Gradation of Water Management Training Institute
|
2009-10 to 2011-12
|
109.214
|
|
|
5
|
Pilot Testing of Solar Water Pumps
|
2009-10 to 2010-11
|
19.23
|
-
Installation of 9 Solar Water Pumps at selected government farms
-
Construction of water storage tanks
-
Data collection and compilation
-
Training/capacity building of the operator in operation, maintenance and management of Solar Water Pumps.
|
|
6
|
Pilot Project for Promotion of Cotton Cultivation in Thal Region with Drip Irrigation
|
01-01-2010 to 31-12-2011
|
267.00
|
|
|
7
|
National Project to Stimulate Adaptation of Permanent Raised Beds for Maize, Wheat and Cotton-Wheat Farming System in Pakistan
|
2007-08 to 2011-12
|
68.71
|
|